Sino Sculpture Group  (Beijing) Ltd
You are here: Home > NEWS & FAQ > Content
About Us
Contact us
Office No.: +8610 60409662
Tel No.:   +86 13701297153
E-mail:
info@sinosculpture.com

Add: No. 43, Lane 1, South Street, Shuipo Village,
Gaoliying Town
Shunyi 
District, 

Beijing, China.101300


Office Hours
Monday – Friday: 8:00 AM – 6:00 PM (GMT+08:00)


Connect 
VR7 FB   YOUTUBE    Twitter   instagram   
NEWS & FAQ
The Process of weld steel frame structure for stainless steel sculptures
Edit: Sino Sculpture Group (Beijing) Ltd     Date: 08-24-2020
The internal substructure(Steel Frame structure) supports the key part of the sculpture's stainless steel panels, which needs to be welded by a licensed professional welders, and the substructure is constructed according to the national steel structure specifications. The welding electrode should be consistent with the material of the substructure, i.e., if the substructure is made of 304 stainless steel, the welding electrode must be used for welding, and the welding specification must comply with national standards.
The main role of the substructure is to determine the accuracy of the panel shape and connect the stainless steel panel and the internal main steel structure, it plays a very important role, Sino Sculpture Group attaches great importance to the quality of the Substructure of the process, welding technicians must hold a certificate issued by the state to carry out welding operations; and we have professional testing equipment, such as flaw detection test, to ensure that it meets the standards before proceeding to the next step.